Active Road Studs

Road studs have been a core offering from Clearview since the 1990s when the first Astucia solar powered road studs were first installed. Since then, we have developed and continue to improve our technology in this area.

  • Low profile solar powered stud installed flush with the road surface.

  • Surface mounted solar powered stud ideal for edge delineation.

About us

Clearview has been delivering technology solutions to the highways and transport sector for 50 years and brings a wealth of knowledge and innovative ideas to the industry.

  • Keep up to date with our news and insights here at Clearview Intelligence.

  • Discover more about the events and webinars we are holding, and exhibitions we are attending this year.

  • Our staff’s health and wellbeing is a priority at Clearview Intelligence, because we care about everyone.

  • We work with partners to deliver intelligent transport solutions all over the world.

  • Minimizing our impact on the planet is a key environmental aim at Clearview Intelligence.

  • Success stories of Clearview Intelligence solutions deployed in the UK and across the world.

  • Links to downloadable zip files containing the relevant software to use in conjunction with our sensor technologies.

  • As we continue to grow, we need creative, professional and tenacious individuals who can help us pioneer intelligent solutions.

Case studies

Enhanced Delineation on the A1

SolarLite Active Road Studs used to improve route safety on the A1 in Scotland through enhanced delineation.

Client
Amey on behalf of Transport Scotland

Location
A1 Scotland

Download
Download the PDF

Background

The A1 is the longest numbered road in the UK, at 410 miles (660 km), connecting the capitals of London and Edinburgh.

The A1 Action Group is made up of elected members from Scottish Borders and East Lothian Council, transportation groups and community councils and is campaigning for single carriageway sections to be dualled. They also seek other ways to improve the safety performance on the road.

Transport Scotland attended meetings in which measures were discussed to ensure that the improving road safety record of the route could be further developed, by concentrating on more local improvements. Representations were made from local communities along the route which mainly focused on the junctions of the A1.

Transport Scotland, together with their operating company for the route, Amey, worked with the local communities to take on board the issues highlighted and design measures which would help reduce concerns. To get an appreciation of the concerns, this included a drive through of each of the junctions during the day and hours of darkness. Entering or exiting the A1 during the hours of darkness was highlighted as a major area of concern.

The proposals for improvements targeted three main concerns;

The lack of definition at and around the junctions

General visibility to and from the junctions

Lack of consistency of signing and road markings

Solution

Transport Scotland and Amey proposed the installation of an innovative solution with the use of solar powered LED road studs at nine junctions on the route. This gave a visual consistency to the route by ensuring all major junctions were treated similarly.

The studs allow the junctions to be defined to approaching drivers and to operate in darkness without the need for external power.

Clearview Intelligence’s solution included using white and red SolarLite Flush Road Studs as road edge and centre delineation; and using amber and green studs to highlight junctions and other egress areas.

In total, there were over 4,100 studs installed along various sections and junctions covering 14 miles of the A1 from the Scottish border to the Granthouse Junction.

The works were completed in early 2016 including a full refreshment of road marking. The effectiveness of the measures will continue to be assessed as part of the annual review of accidents on the trunk road network.

Key Benefits

  • Improved safety through greater awareness of oncoming junctions
  • Enhanced driver experience via increased visibility of the oncoming road layout
  • Less environmental impact through use of solar power
  • Local community is engaged and feel safer

Enhanced Delineation on the A1