Active Road Studs

Road studs have been a core offering from Clearview since the 1990s when the first Astucia solar powered road studs were first installed. Since then, we have developed and continue to improve our technology in this area.

  • Low profile solar powered stud installed flush with the road surface.

  • Surface mounted solar powered stud ideal for edge delineation.

About us

Clearview has been delivering technology solutions to the highways and transport sector for 50 years and brings a wealth of knowledge and innovative ideas to the industry.

  • Keep up to date with our news and insights here at Clearview Intelligence.

  • Discover more about the events and webinars we are holding, and exhibitions we are attending this year.

  • Our staff’s health and wellbeing is a priority at Clearview Intelligence, because we care about everyone.

  • We work with partners to deliver intelligent transport solutions all over the world.

  • Minimizing our impact on the planet is a key environmental aim at Clearview Intelligence.

  • Success stories of Clearview Intelligence solutions deployed in the UK and across the world.

  • Links to downloadable zip files containing the relevant software to use in conjunction with our sensor technologies.

  • As we continue to grow, we need creative, professional and tenacious individuals who can help us pioneer intelligent solutions.

Case studies

Re-lighting the cycle route – the Cambridgeshire Guided Busway

Cambridgeshire County Council, in partnership with Milestone Infrastructure decided that all studs should be fully renewed.

Client
Cambridgeshire County Council

Location
Cambridgeshire, United Kingdom

Download
Download the PDF

Background

The Cambridgeshire Guided Busway (also known as the Cambridge-Huntingdon Rapid Transit Scheme) connects Cambridge, Huntingdon and St Ives. At 25km it is the longest track of its kind in the world.

The busway was opened in August 2011 as part of the Cambridge Gateway Project, designed to improve bus, cycle and pedestrian access to Cambridge railway station by offering a viable alternative to the congested A14 road.

Running alongside the busway is a wide cycle path which connects St Ives with the north of Cambridge, and Cambridge Rail Station with Trumpington Park & Ride and Addenbrooke’s Hospital. The cycle path can also be used by pedestrians and partly as a bridleway.

At this time Cambridgeshire County Council recommended that the cycle path required night time route delineation to help users clearly see the path edges, both on the outside edge of the path and adjacent to the bus guidance tracks.

Given the rural nature of much of the route, there was a wish to avoid excessive reliance on overhead lighting which necessitates additional street furniture and contributes to light pollution. There was also a need to avoid the costs of tunnelling and the intrusive disturbance of laying electric cables along the route.

Solution

In 2013 Clearview Intelligence worked with Cambridgeshire County Council to design a lighting solution that provided cyclists and pedestrians with clear delineation between the cycle path and the busway tracks.

SolarLite Active Road Studs were the perfect solution as they provide lower levels of illumination than overhead lights whilst having much less impact on light pollution and on nocturnal wildlife than traditional lighting.

SolarLite Active Road Studs were installed all along the northern section of the busway from the Cambridge Science Park towards St Ives. The studs were installed at 20 metre intervals on either side of the path.

2023 – Re-lighting

Ten years on, some of the solar road studs needed changing, having lasted for 25% longer than their original design life.

Cambridgeshire County Council, in partnership with Milestone Infrastructure, decided that instead of just replacing those it was decided that all of them should be fully renewed in one project.

Cambridgeshire County Council, in partnership with Milestone Infrastructure, decided that re-installation and re-lighting of the cycle route was essential. This is testament to the huge success of the original scheme and overall longevity of the solar studs.

Clearview have just completed renewal of the solar studs along the cycle route with red studs placed at junctions of certain inter-sections – warning the cyclist or pedestrian where there may be a potential hazard, such as a crossing.

Key Benefits

  • Safety – clear delineation of the cycle path edges protects cyclists and other users from straying onto the busway
  • Environmentally friendly – reliable source of light all year round without adversly impacting on local light pollution levels
  • Sustainability – totally sustainable harnessing free solar energy